Design of the metro tunnel project tunnel linings for fire testing
Download
Full text for this resource is not available from the Research Repository.
Export
Guerrieri, Maurice ORCID: https://orcid.org/0000-0001-7916-7003, Sanabria, Carlos, Lee, Wei Ming, Pazmino, Esteban and Patel, Rahul
(2020)
Design of the metro tunnel project tunnel linings for fire testing.
Structural Concrete, 21 (6).
pp. 2452-2480.
ISSN 1464-4177
Dimensions Badge
Altmetric Badge
Item type | Article |
URI | https://vu-9.eprints-hosting.org/id/eprint/41886 |
DOI | 10.1002/suco.202000140 |
Official URL | https://onlinelibrary.wiley.com/doi/10.1002/suco.2... |
Subjects | Historical > FOR Classification > 0905 Civil Engineering Current > Division/Research > Institute for Sustainable Industries and Liveable Cities |
Keywords | Melbourne's Metro Tunnel Project; transport infrastructure; underground tunnels; shield tunneling method; fire; RABT ZTV (rail) fire curve; flat panels |
Citations in Scopus | 3 - View on Scopus |
Download/View statistics | View download statistics for this item |
CORE (COnnecting REpositories)